Demolition of existing building above ground with retention of existing basement and piles/foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway (Little New Street To Wine Office Court), enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works.
Archives: Planning posts
4 – 5 Paris Garden and 18 – 19 Hatfields (including part 6 Paris Garden, Flank Wall of 17 Hatfields and Undercroft Servicing route), London SE1 8ND
Part demolition and part retention, refurbishment, and extension of 4-5 Paris Garden, together with demolition and redevelopment of 18-19 Hatfields, to provide Use Class E(g)(i) floorspace in a single five to eleven storey building with a single basement; including basement car and cycle parking and servicing area, external landscaped courtyard linking Paris Garden and Hatfields, landscaped terraces, rooftop plant equipment and enclosures, and other associated works. Listed building consent application: Structural and remedial works, and cosmetic repairs to the flank wall of 17 Hatfields.
Hungerford Coach Park at South Bank, London, SE1
Temporary planning permission from 11th April 2024 to 13th January 2025 (including installation and de-installation) for the erection of structures and signage, including 12 bar areas, up to 15 food concessions units, covered stage structures, brand activation/sponsor pop ups, outdoor seating areas, toilets and storage for the ‘Between the Bridges 2024 initiative.
Ground Floors, Lords Cricket Ground, St John’s Wood Road, London, NW8 8QN
Application 1 :23/08458/FULL:
Demolition of the existing Allen stand and the erection of a new stand with a link bridge to the adjacent Pavilion, refurbishment and extension of the Tavern stand including the provision of new hospitality facilities, retail and food and beverage floorspace. Works also include hard and soft landscaping, servicing facilities, and all necessary ancillary and enabling works, plant and equipment, and installation of PV panels on the Thomas Lord Suite.
Application 2:23/0862/LBC:
Demolition of existing bridge link and creation of a new bridge link between the Pavilion building and the Allen stand and restoration of terracotta cladding on the Pavilion building.
529 – 533 Oxford Street, London, W1C 2QL
Use of ground floor and mezzanine level as a food court including provision for on and off-site consumption of food and drinks (Sui Generis) and external alterations, changing shopfront doors on Oxford Street.
19 – 24, Dering Street, London W1
Part demolition, part redevelopment and extension to provide a building of two basements, ground and five upper floors, setback sixth floor and setback seventh floor with roof plant and terraces, accommodating commercial, business and service (Class E) use and associated ancillary spaces.
Shaftesbury Centre, 85 Barlby Road, London W10 6AZ
Demolition of existing building and construction of new office building (Use Class E), landscaping and ancillary works (MAJOR APPLICATION).
Hill House, 1 Little New Street, London EC4A 3JR
Demolition of existing building above ground with retention of existing basement and piles/ foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway (Little New Street To Wine Office Court), enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works.
Holiday Inn Express London, City, 275 Old Street, London, EC1V 9LN
Redevelopment to provide a two storey extension comprising additional hotel bedrooms (Class C1), refurbishment of the building including reconfiguration of the ground floor and introduction of a cafe (Class E) with associated cycle parking and landscaping.
Site comprising 53-56 New Bond Street/5-17/ 17a Brook Street, London, W1S 1RJ
Alteration and extension of the existing buildings, including partial demolition and retention and retrofit to provide a building with basement, ground and ten upper floors, setback at fifth to eighth floors with terraces, setback at ninth floor with terrace and plant, and a roof terrace with lift over run and pavilion at the tenth floor, with satellite dish, green roof and solar photovoltaic panels on its roof, and associated works, to provide for retail (Class E (a)) and office (Class E(g)(i)) uses together with associated ancillary spaces to those uses.