Scheme approved. Use of part of Victoria Embankment Gardens and erection of temporary structures for a temporary cinema event for the BFI London Film Festival and a series of World Cinema premieres from 10th to 21st October 2018 (including construction of de-rigging between 27 September to 29 October 2018). Display of 3 externally illuminated fascia signs measuring 5.4m x 4m, 2m x 6m, 2m x 1.5m, and a non-illuminated hoarding sign measuring 0.5m x 1m.
Archives: Planning posts
Marylebone Institute School House, 29 Cosway Street
Scheme approved. Demolition of existing buildings and structures and erection of new building of up to five storeys plus basement floor to provide 49 residential units (Class C3); with car and cycle parking, storage and plant rooms at basement level and landscaping to central garden and site frontages and associated works (linked to redevelopment of 2 Ashbridge Street and Ashmill Street Car Park sites that are also on this agenda – Items 2 and 3)
Repeater Station, 2 Ashbridge Street
Scheme approved. Demolition of existing BT Repeater Station building, with retention of BT service area and associated access. Redevelopment fo the site to erect a five storey building to provide 26 residential units, with existing basement floor used to provide parking, plant and services spaces accessed via anew ramp from Ashbridge Street. Removal of existing vehicular ramp to rear of site and provision of new landscaping to amenity space (linked to redevelopment of 29 Cosway Street and Ashmill Street Car Park sites that are also on this agenda – Items 1 and 3).
North Westminster Community School, North Wharf Road
Scheme approved. Demolition of existing buildings to the centre and eastern end of the site and redevelopment comprising erection of buildings of between six and 20 storeys in height to provide 335 residential units (Class C3), a hotel and serviced apartments (Class C1), offices (Class B1), gym (Class D1), retail (Class A1/A3) and a primary school (Class D1) with associated landscaping and open space, highways works, off street ground floor service bay and two storey basement to provide car, cycle and motorcycle parking and ancillary servicing space. Namely, to provide a second servicing bay accessed from the approved vehicular entrance in North Wharf Road, alterations to the car and cycle basement to ground floor level, amendment to the layout and quantum of ground floor commercial spaces (Classes A1, A3, B1 and D2), raising of the height of the gym block to accommodate second floor, amendment of gym block west facade alignment and detailing, amendments to landscaping including a revision to the locations of trees and planters, amendment of residential layouts including alterations to the mix of market residential flats, facade amendments including insertion of additional windows, balcony detailing and introduction of window mullions, introduction of balconies at Levels 18 and 19 to Block C to replace winter gardens and minor increases in the height of the buildings. NAMELY, external alterations to approve hotel, serviced apartments and school building, internal layout changes to hotel and serviced apartments with the number of hotel increased from 224 to 373 rooms and serviced apartments increased from 55 to 247, internal alterations to school, and amendment of conditions to allow phased delivery of amended scheme and to amend condition triggers.
604-610 Streatham High Road
Scheme approved. Demolition of existing buildings and redevelopment of the site to provide 27 no. residential dwellings in buildings of up to 5 storeys (plus lower ground floor), with associated accesses, landscaping and amenity space.
Pocklington Court, 74 Alton Road
Scheme approved. Demolition of existing buildings and erection of part 2, 5 and 6 storey buildings comprising 41 No. Class C3 Extra Care units and 54 No. Class C3 intermediate affordable units; landscaping and new public realm; energy centre; new basement/lower ground car park accessed off Alton Road (from existing access point); and new vehicular access off Alton Road into site.
31-33 Grove Vale
Scheme refused. Change of use of the upper floors of The Cherry Public House from ancillary staff accommodation (Class A2) use) to create a 26-bed bunk house hostel (Sui Generis – visitor Accommodation) across four rooms plus ancillary accommodation for the general manager.
London Southbank University, 103 Borough Road
Scheme approved. Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street and other associated works.
136-142 New Kent Road
Scheme approved. Demolition of the existing building and construction of a part 13 storey/part 9 storey block fronting onto New Kent Road and a part 6 storey/part 4 storey block fronting Munton Road, to provide a mixed-use development, with basement, providing 81 residential units, 1361 sqm of flexible business floor space/non-residential institution (Use Class B1/D1) and 448sqm of retail floor space (Use Class A1) with associated landscaping and private and communal residential amenity space.
2-6 St Pancras Way
Scheme approved. Demolition of the existing building (Class B1 and B8) and erection of 6 new buildings ranging in height from 2 storeys to 12 storeys in height above ground and 2 basement levels comprising a mixed use development of 54,247sqm business floorspace (B1), 73 residential units (C3) (10 x studio, 30 x 1 bed, 27 x 2 bed 7 x 3 bed), 87 bed hotel (C1), 1,601sqm gym (D2), 6,104sqm flexible retail (A1 – A4/A1-A4,B1/A1, A4, B1, B8) and 6,011sqm storage space (B8) development with associated landscaping work.